- What it tracksCosts and revenue for each job
- Best forCustom or one-off work
- Cost typesMaterials, labor, subcontractors, overhead
- What it answersDid this job make money?
What is job costing?
So, what is job costing in practice? You record each cost against the specific job it was spent on. Each job gets its own record. Every bill, hour of labor and materials delivery is assigned to a job, and the totals show what the job really cost.
Without it, your books only tell you that the business as a whole made or lost money in a month. With it, you can see that the kitchen remodel earned a healthy margin while the deck lost money.
Here is the job costing definition accountants work from: a cost accounting method that collects the direct costs and a share of the indirect costs for each separate job, project or customer order, then compares that total with the revenue from the same job.
Two terms in that definition need a word of explanation. A job is a distinct piece of work with its own start, finish and price. Cost accounting means tracking costs in more detail than a standard profit and loss statement shows.
What goes into a job's cost
- Direct materials: lumber, parts, fabric, software licenses, anything bought for this job.
- Direct labor: wages and related payroll costs for hours worked on this job.
- Subcontractors: outside firms you pay to do part of the work.
- Other direct costs: permits, equipment rental, travel, delivery fees.
- Overhead: indirect costs that support many jobs at once, such as shop rent, equipment upkeep, supervisors and insurance, spread across jobs by a consistent rule.
The first four are traced to the job directly. Overhead is allocated, which means you share it out using a rule, such as a fixed amount per direct labor hour. Office costs that do not support the work itself, like marketing, are usually left out of job cost and tracked as general expenses.
How a job costing system works
A job costing system is the set of records and habits that keep each job's numbers accurate. It can live in accounting software, a spreadsheet or a project tool. The tool matters less than coding every cost the same way, every time.
- Open a jobGive each job a unique name or number the moment it is sold, with its estimate and contract price.
- Code every costTag each bill, receipt and payroll hour to a job when it is entered, never weeks later.
- Allocate overheadApply shared costs to jobs using one rule, applied the same way every month.
- Compare to the estimateReview actual cost against budget while the job is running, so surprises show up early.
- Close the jobWhen work ends, finish the final costs, record the margin and keep the lessons for your next estimate.
A worked example
Here is a single remodeling job with every cost tied to it. The figures are sample data, invented for this page.
Job 214, bathroom remodel
| Contract price | 24,000.00 |
| Materials | (7,300.00) |
| Direct labor | (6,900.00) |
| Plumbing subcontractor | (3,200.00) |
| Permits and dumpster | (650.00) |
| Allocated overhead | (2,400.00) |
| Job profit | 3,550.00 |
With the job cost sheet in hand, you can see where the plan slipped. Perhaps labor ran past the 120 hours, or materials cost more than the quote. That tells you how to price the next bid.
Construction job costing
Construction job costing is one of the most common uses, because contractors sell one-off projects at a fixed or estimated price. A builder may run a dozen jobs at once, each with different crews, suppliers and subcontractors.
Contractors often break each job into cost codes, such as site work, framing, electrical and finishes, so each phase can be compared with its own budget. Payroll for job-site crews is coded to the job too. Public projects can bring extra payroll reporting, which the certified payroll page explains.
Job costs also keep billing honest. Many contractors invoice in stages. Dividing costs to date by the total estimated cost gives a rough percent complete, and comparing that share of the contract price with the amount billed shows whether you have billed ahead of the work done or fallen behind it. Our construction bookkeeping service sets up these jobs and cost codes.
Job order costing and what it is used for
Job order costing is the name cost accounting textbooks give to the same approach. Each customer order is a job, and a job cost sheet collects the materials, labor and overhead that order used. You see the term most in manufacturing and print shops, where a batch of custom parts or a run of signs counts as one order.
In day-to-day use the two names mean the same thing: you follow costs job by job instead of averaging them across all output.
If you are wondering what is job order costing good for, the answer is any business where each order differs in size, materials or labor, so an average cost would mislead you.
A custom cabinet shop, an engineering firm, a print shop, an ad agency and a roofing company all fit. Each one sets its price per job, so it needs to know its cost per job too.
Job costing vs process costing
The two methods answer different questions. Job costing follows one distinct order. Process costing totals the cost of a continuous run for a period and averages it across all the units produced.
A bakery that bakes the same loaf all day uses process costing. A bakery that makes custom wedding cakes uses job costing.
| Job costing | Process costing | |
|---|---|---|
| Output | Unique jobs or orders | Identical units in bulk |
| Cost is tracked by | Each job | Each process or department |
| Unit cost | Total cost of that job | Department cost for the period divided by units produced, with unfinished units counted as partly done |
| Typical users | Contractors, custom shops, agencies | Chemical, food, paper and fuel producers |
| Main record | Job cost sheet | Production cost report |
To choose, ask whether two units of your output are interchangeable. If they are, averages work. If each one is different, track each job on its own.
Some businesses use both. A manufacturer might run a continuous line for stock items and a custom order desk for special requests, and each side needs its own method.
Where job costing goes wrong
- Costs are coded to a job weeks later, from memory, so the figures are guesses.
- Labor is tracked by the week and not by the job, which hides which jobs ate the hours.
- Overhead is ignored, so a job looks profitable until the shared costs are counted.
- Job codes are created on the fly with inconsistent names, and totals split across duplicates.
- Nobody compares actual cost with the estimate until the job is finished and the money is gone.
Keep job-level books without the chasing
Our accountants code costs to each job, reconcile the accounts and send you job-level reports, with a senior accountant reviewing every close.
Book a consultation callSee construction bookkeepingQuestions people ask
What is job costing in simple terms?
It is tracking what each job costs, so you know whether that job made or lost money. Costs are tied to a job when they are recorded.
What is the difference between job costing and a profit and loss statement?
A profit and loss statement shows the whole business for a period. Job costing breaks the job-related costs and revenue down by job, so you see which work earned the profit.
Job order costing vs process costing: which should I use?
Use job order costing when each order is different, because it adds up the materials, labor and overhead of that one order. Use process costing when every unit is identical, because it averages a department's costs for a period over the units made.
Do I need special software for a job costing system?
Not always. Many small firms use QuickBooks, Xero or Excel with a class, tag or job field on every entry. The habit of coding every cost matters more than the tool.
How do I handle overhead in job costing?
Pick one allocation rule, such as a fixed amount per direct labor hour, and apply it every month. A consistent rule beats a perfect one.
Can a service business use job costing?
Yes. Agencies, consultants and engineering firms track staff time and expenses against each client project in the same way.
How does job costing connect to the books?
Each job cost is recorded to an account listed in your chart of accounts, such as materials or work in progress, and posted to the general ledger, with the job tag letting you filter by project.
How often should I review job costs?
Weekly for busy jobs, and at least monthly for the rest. If you only look at the end, a losing job can no longer be fixed.